激光粒度儀的調(diào)試前的需要檢查五點(diǎn)

來源:

作者:


 激光粒度儀使用時(shí)也要進(jìn)行特定的安裝調(diào)試,那么我們?nèi)绾握_的對粒度儀進(jìn)行正確的調(diào)試呢?還有就是在調(diào)試時(shí)要注意那些問題呢?在正式開始使用激光粒度儀,我們需要做好激光粒度儀的調(diào)試前的檢查工作。具體工作內(nèi)容如下:

The use of laser particle sizer are subject to the specific installation and debugging, then how can we correct the sizer correct debugging? There is in commissioning should pay attention to those problems? In the official start using laser particle sizer, we need to do a good job of laser particle sizer commissioning before the inspection work. Specific work is as follows:

  1、新安裝的設(shè)備,在設(shè)備就位時(shí),難免會(huì)殘留鐵塊、焊條頭、焊渣等異物。在不開主電機(jī)的情況下,打開進(jìn)料口下面的除雜擋板,讓雜質(zhì)和洗倉物料從此處排出;

1, the new equipment installed in the equipment in place, will foreign body iron, welding head and welding slag etc.. When the main motor is not opened, the impurity removing plate is opened under the feed port, so that impurities and washing materials are discharged from this place;

 

  2、當(dāng)我們前期檢查一切正常后,通電啟動(dòng)設(shè)備。檢查所有電機(jī)的旋轉(zhuǎn)方向;

2, when we check all previous normal, electrify start device. Check the direction of rotation of all motors;

 

  3、檢查電磁閥噴吹是否正常吸合有力,調(diào)節(jié)除塵器電磁閥脈寬和噴吹間隔時(shí)間;

3, check whether the solenoid valve jet is normal, pull strong, adjust the dust collector solenoid valve pulse width and jet interval time;

 

  4、檢查剎克龍下面關(guān)風(fēng)器是否有漏風(fēng)現(xiàn)象,可以用手或細(xì)粉料放在接口處有無往里吸的感覺,如有必須進(jìn)行密封處理。上述檢查一切正常后,準(zhǔn)備帶料生產(chǎn);

4, check the cyclone wind closing device if there is leakage phenomenon, can use hand or fine powder on the interface without feeling smoke inside, if must be sealed. The above inspection is normal, ready to take material production;

 

  5、對激光粒度儀92454.com.cn的喂料電機(jī)和分級輪電機(jī)兩個(gè)變頻器進(jìn)行參數(shù)檢查設(shè)定,檢查電機(jī)所對應(yīng)的空開、接觸器、熱繼電器、過電流繼電器調(diào)整是否合適,將一次線全部重新鎖緊一遍。

5 frequency converter of laser particle sizer 92454.com.cn feeding motor and grading wheel motor parameters corresponding to check the settings, check the motor circuit breaker, contactor, thermal relay, overcurrent relay adjustment is appropriate, will be the first line to lock again.